高速液壓夯實(shí)機(jī) HIGH -SPEED HYDRAULIC RAMMING MACHINE
山東天路TRA系列高速液壓夯實(shí)機(jī)是專(zhuān)為壓實(shí)填充物及軟地基處理設(shè)計(jì)的,可以快捷、迅速地安裝于裝載機(jī)或挖掘機(jī)上。具有良好機(jī)動(dòng)性,可控制性,是一種獨(dú)特的、快速的夯實(shí)設(shè)備。另外,在橋頭壓實(shí)中,使用振動(dòng)壓路機(jī)以分層壓實(shí),很難達(dá)到技術(shù)要求,但使用夯實(shí)機(jī)可以很容易地達(dá)到要求。而且在壓實(shí)過(guò)程中壓實(shí)度也可以進(jìn)行隨時(shí)監(jiān)控,對(duì)橋梁、橋臺(tái)連接部位有較佳的夯實(shí)效果,可有效處理橋頭跳車(chē)現(xiàn)象,解決舊路加寬中的新舊路基沉降不均勻等質(zhì)量通病。
●采用專(zhuān)屬設(shè)計(jì)圖紙?jiān)O(shè)計(jì)并生產(chǎn),是國(guó)內(nèi)產(chǎn)品整體合理,設(shè)計(jì)完善的高品質(zhì)、高可靠性高速液壓夯實(shí)機(jī)。
●擁有專(zhuān)屬的高蓄能多回路液壓集成系統(tǒng)解決了高頻率工作狀態(tài)下系統(tǒng)過(guò)熱的問(wèn)題,國(guó)產(chǎn)夯實(shí)機(jī)系統(tǒng)過(guò)熱問(wèn)題一直未能解決,需工作一段時(shí)間后,停工降溫。
●大流量補(bǔ)油雙蓄能器、雙回路高速油缸和多回路液壓集成閥,可確保單蓄能器不能保證的錘體在任何位置都能以自由落體的形式下落,以達(dá)到更大的打擊能量,同時(shí)保證在同樣重量錘的前提下對(duì)地層深度和幅度的影響更大化。
●夯板的設(shè)計(jì)行程更大,可避免機(jī)體與夯板的碰撞,確保裝載機(jī)與夯實(shí)機(jī)夯實(shí)時(shí)的隨動(dòng),更大限度的發(fā)揮了夯實(shí)機(jī)對(duì)地層的影響深度。
TRA series of high-speed hydraulic rammer is designed for compaction padding and soft foundation treatment design, quickly, quickly nstalldl on the loader and excavator. Have good mobility, cotolability and fficiency, it is a unique, fast compaction equipment In adition, in the bridge compaction, the use of vibrating roller with hierarchical compaction, it is dificult to meet the technical requirements, but use rammer can be easily achieved. And in medium voltage degree can also be compaction process monitoring, at any time, the abutment of the bridge connection parts has the best compaction effect, can ffectively deal with vehicle dumpping phenomenon, solve the old road widening of old and new embankment setle-ment such as uneven quality common fault.
Using patent design drawing design and production, is reasonable overall domestic products, design perfect high quality, high relibilt, high speed hydraulic rammer.
Low proprietary dual-circuits power hydraulic integrated system solved the high frequency work condition system from overheating and over-heating of the domestic compactor system has been unable to solve, need to work after a perlod of time, shuldown cooling.
Low flow oil compensaling double accumulator, dual-circuits power high speed hydraulic integrated valve, eylinder and double circuit ensures that hammer body in any position of the single accumulator can't guarantee can be in the form of free fall down, in order to achieve greater blow energy, at the same time guarantee in the same weight hammer under the premise of the impact on the fomation depth and scope.
Low ram plate design schedule is bigger, can avoid the body with ram plate olision, and ensure that loader rammer ramming fllow-up,maximum full play the compactor's influence on the formation depth.